Front wheels had their first fit today. Again bearings fitted without any issues into the uprights and then the stub axles assembled into the uprights without any issues. And then the uprights were re-assembled to the suspension and wheels fitted.
Offsets to the loosely fitted body looked correct to CAD, but we need to set the bodywork correctly and recheck. Also I have calculated the dampers stroke lengths at 45mm bump and drop, and we will manufacture an adjustable jig to replicate the these dimensions so we can check that clearances at the extremes match the CAD packages.